Neighbourhood Planning Act 2017

Sections62AmendmentsCases SoonExplanatory Notes Soon
Version
Compare with

Neighbourhood Planning Act 2017

2017 c. 20

An Act to make provision about planning and compulsory purchase; and for connected purposes.

Enacted[27th April 2017]

Part 1 Planning

Neighbourhood planning

I131 C25Duty to have regard to post-examination neighbourhood development plan

1 Section 70 of the Town and Country Planning Act 1990 (determination of applications for planning permission: general considerations) is amended as follows.
2 In subsection (2) (matters to which local planning authority must have regard in dealing with applications) after paragraph (a) insert—
.
3 Before subsection (4) insert—

I1I422 Notification of applications to neighbourhood planning bodies

1 Schedule 1 to the Town and Country Planning Act 1990 (local planning authorities: distribution of functions) is amended as follows.
2 Paragraph 8 (duty to notify parish council of planning application etc) is amended in accordance with subsections (3) to (5).
3 After sub-paragraph (3) insert—
4 In the opening words of sub-paragraph (4) for “the duty” substitute “ a duty under this paragraph ”.
5 In the opening words of sub-paragraph (5) for “their duty” substitute “ a duty under this paragraph ”.
6 Paragraph 8A (duty to notify neighbourhood forums) is amended in accordance with subsections (7) to (9).
7 After sub-paragraph (1) insert—
8 In sub-paragraph (2)—
a before the definition of “neighbourhood forum” insert—
, and
b after the definition of “neighbourhood forum” insert—
9 In sub-paragraph (3) for “(3) to (6)” substitute “ (3) and (4) to (6) ”.
10 Section 62C of the Town and Country Planning Act 1990 (notification of parish councils of applications made to Secretary of State) is amended in accordance with subsections (11) and (12).
11 In subsection (2) after “paragraph 8(1)” insert “ or (3B) ”.
12 In subsection (3) after “Schedule 1” insert “or notifications received by the authority under paragraph 8(3C) or (3D) of that Schedule.

I143 Status of approved neighbourhood development plan

In section 38 of the Planning and Compulsory Purchase Act 2004 (development plan) after subsection (3) insert—

I2I434 Modification of neighbourhood development order or plan

1 Section 61M of the Town and Country Planning Act 1990 (revocation or modification of neighbourhood development orders) is amended in accordance with subsections (2) and (3).
2 After subsection (4) insert—
3 In subsection (5)—
a for “that order” substitute “ the neighbourhood development order mentioned in subsection (4) or (4A) ”, and
b after “(4)” insert “ or (4A) ”.
4 The Planning and Compulsory Purchase Act 2004 is amended in accordance with subsections (5) to (10).
5 In section 38A (meaning of “neighbourhood development plan”) after subsection (11) insert—
6 Section 38C (neighbourhood development plans: supplementary provisions) is amended in accordance with subsections (7) to (9).
7 After subsection (2) insert—
8 In subsection (3)—
a the words from “the words” to the end of the subsection become paragraph (a), and
b at the end of that paragraph insert
9 In subsection (6)—
a the words from “on proposals” to the end of the subsection become paragraph (a), and
b at the end of that paragraph insert
10 After Schedule A1 insert the Schedule A2 set out in Schedule 1 to this Act.

I455 Changes to neighbourhood areas etc

1 The Town and Country Planning Act 1990 is amended in accordance with subsections (2) to (4).
2 In section 61F (authorisation to act in relation to neighbourhood areas) after subsection (8) insert—
3 In section 61G (meaning of “neighbourhood area”) after subsection (6) insert—
4 In section 61J (provision that may be made by neighbourhood development order) after subsection (5) insert—
5 The Planning and Compulsory Purchase Act 2004 is amended in accordance with subsections (6) to (8).
6 In section 38A (meaning of “neighbourhood development plan”) after subsection (11A) (as inserted by section 4) insert—
7 In section 38B (provision that may be made by neighbourhood development plans) after subsection (2) insert—
8 In section 38C (supplementary provisions) after subsection (5) insert—

I476 Assistance in connection with neighbourhood planning

1 Section 18 of the Planning and Compulsory Purchase Act 2004 (statement of community involvement) is amended as follows.
2 At the beginning of subsection (2A) insert “ Subject to subsection (2B), ”.
3 After subsection (2A) insert—

7 Engagement by examiners with qualifying bodies etc

In Schedule 4B to the Town and Country Planning Act 1990 (process for making neighbourhood development orders), in paragraph 11 (regulations about independent examinations) after sub-paragraph (2) insert—

Local development documents

8 Content of development plan documents

I291 In section 19 of the Planning and Compulsory Purchase Act 2004 (preparation of local development documents) after subsection (1A) insert—
I562 In section 34 of that Act (guidance)—
a the existing words become subsection (1), and
b after that subsection insert—
I293 In section 35 of that Act (local planning authorities' monitoring reports) after subsection (3) insert—

I3I309 Power to direct preparation of joint development plan documents

1 The Planning and Compulsory Purchase Act 2004 is amended as follows.
2 After section 28 insert—
3 In section 21 (intervention by Secretary of State) after subsection (11) insert—
4 In section 27 (Secretary of State's default powers) after subsection (9) insert—
5 Section 28 (joint local development documents) is amended in accordance with subsections (6) and (7).
6 In subsection (9) for paragraph (a) substitute—
.
7 In subsection (11) (meaning of “corresponding document”) at the end insert “or a corresponding joint local development document for the purposes of this section.
8 In section 37 (interpretation) after subsection (5B) insert—
9 Schedule A1 (default powers exercisable by Mayor of London, combined authority and county council) is amended in accordance with subsections (10) and (11).
10 In paragraph 3 (powers exercised by the Mayor of London) after sub-paragraph (3) insert—
11 In paragraph 7 (powers exercised by combined authority) after sub-paragraph (3) insert—

I3110 County councils' default powers in relation to development plan documents

Schedule 2 makes provision for the exercise of default powers by county councils in relation to development plan documents.

I1511 Format of local development schemes and documents

1 Section 36 of the Planning and Compulsory Purchase Act 2004 (regulations under Part 2) is amended in accordance with subsections (2) and (3).
2 In the heading after “Regulations” insert “ and standards ”.
3 After subsection (2) insert—
4 In section 15(8AA) of that Act (cases in which direction to revise local development scheme may be given by Secretary of State or Mayor of London)—
a after “only if” insert “ —(a) ”, and
b at the end of paragraph (a) insert

I4I1612 Review of local development documents

In section 17 of the Planning and Compulsory Purchase Act 2004 (local development documents) after subsection (6) insert—

I513 Statements of community involvement

1 Section 18 of the Planning and Compulsory Purchase Act 2004 (statement of community involvement) is amended as follows.
I482 In subsection (2) after “sections” insert “ 13, 15, ”.
3 After subsection (3A) insert—

Planning conditions

I1714 Restrictions on power to impose planning conditions

I491 After section 100 of the Town and Country Planning Act 1990 insert—
2 In section 333 of the Town and Country Planning Act 1990 (regulations and orders) after subsection (3ZA) insert—
I493 Section 100ZA of the Town and Country Planning Act 1990 (as inserted by subsection (1) of this section) has effect in relation to conditions on a grant or modification of planning permission only if the permission is granted or modified on or after the coming into force of this section.
I504 Schedule 3 contains amendments in consequence of subsection (1).

Permitted development rights relating to drinking establishments

C6815 Permitted development rights relating to drinking establishments

1 As soon as reasonably practicable after the coming into force of this section, the Secretary of State must make a development order under the Town and Country Planning Act 1990 which—
a removes any planning permission which is granted by a development order for development consisting of a change in the use of any building or land in England from a use within Class A4 to a use of a kind specified in the order (subject to paragraph (c)),
b removes any planning permission which is granted by a development order for a building operation consisting of the demolition of a building in England which is used, or was last used, for a purpose within Class A4 or for a purpose including use within that class, and
c grants planning permission for development consisting of a change in the use of a building in England and any land within its curtilage from a use within Class A4 to a mixed use consisting of a use within that Class and a use within Class A3.
2 Subsection (1) does not require the development order to remove planning permission for development which has been carried out before the coming into force of the order.
3 Subsection (1) does not prevent—
a the inclusion of transitional, transitory or saving provision in the development order, or
b the subsequent exercise of the Secretary of State's powers by development order to grant, remove or otherwise make provision about planning permission for the development of buildings or land used, or last used, for a purpose within Class A4 or for a purpose including use within that class.
4 A reference in this section to Class A3 or Class A4 is to the class of use of that name listed in the Schedule to the Town and Country Planning (Use Classes) Order 1987 (SI 1987/764).
5 Expressions used in this section that are defined in the Town and Country Planning Act 1990 have the same meaning as in that Act.

Development of new towns by local authorities

I1816 Development of new towns by local authorities

1 The New Towns Act 1981 is amended as follows.
2 After section 1 insert—
3 In section 77 (regulations and orders)—
a in subsection (2), after “which” insert “ , subject to subsection (2A), ”, and
b after subsection (2) insert—

Planning register

17 Register of planning applications etc

After section 69 of the Town and Country Planning Act 1990 insert—

Part 2 Compulsory purchase etc

C2C4C17C14C40C55CHAPTER 1 Temporary possession of land

18 Power to take temporary possession of land

1 Subsection (2) applies where a person (an “acquiring authority”)—
a has a power conferred by an Act to acquire land compulsorily (with or without authorisation from another person), or
b is or has been, at any time, otherwise authorised to acquire land compulsorily.
2 The acquiring authority may, for purposes connected with the purposes for which it could acquire land compulsorily, take temporary possession of land—
a by agreement, or
b compulsorily, if authorised to do so in accordance with section 19.
3 Subject to any express provision in another Act, the power in subsection (2) is the only power under which a person may take temporary possession of land compulsorily.
4 For the purposes of this Chapter references to acquiring land include references to acquiring a right over land by creation.

19 Procedure for authorising temporary possession etc

1 This section sets out how an acquiring authority may be authorised to take temporary possession of land compulsorily under section 18(2).
2 The temporary possession of the land must be authorised by the type of instrument (the “authorising instrument”) that would be required if the acquiring authority proposed to acquire that land compulsorily for the purposes for which it proposes to take temporary possession of that land.
3 Accordingly, the authorising instrument—
a may make provision relating to temporary possession of land as well as, or instead of, compulsory acquisition,
b if it authorises the compulsory acquisition of land, may authorise temporary possession of the same or other land, and
c if it makes provision relating to temporary possession, is to be subject to the same procedures for authorising and challenging it as if the provision relating to temporary possession were provision relating to compulsory acquisition.
4 But in so far as an authorising instrument authorises the temporary possession of land, the instrument is not to be subject to special parliamentary procedure by virtue of any enactment applying that procedure to an instrument authorising the compulsory acquisition of land, unless the land which is proposed to be subject to temporary possession is held by the National Trust inalienably.
5 For the purposes of subsection (4)—
a the National Trust” means the National Trust for Places of Historic Interest or Natural Beauty incorporated by the National Trust Act 1907, and
b land is held by the National Trust “inalienably” if it is inalienable under section 21 of the National Trust Act 1907 or section 8 of the National Trust Act 1939.
6 For the purposes of subsection (3)(c), the reference to compulsory acquisition does not include the compulsory acquisition of a right over land by creation unless section 18(2) applies in relation to the acquiring authority by virtue only of a power or authorisation to acquire a right over land by creation.
7 The authorising instrument must—
a identify the land which is to be subject to temporary possession,
b describe the purposes for which temporary possession is required, and
c specify the total period of time for which the land may be subject to temporary possession.
8 The authorising instrument does not need to include the dates of any particular period of temporary possession (but see section 20).

20 Notice requirements

1 Before taking temporary possession of land compulsorily for a period of time by virtue of section 18(2) an acquiring authority must give a notice of intended entry to each person who has an interest in or a right to occupy the land, so far as known to the authority after making diligent inquiry.
2 The notice must specify the period after the end of which the acquiring authority may take temporary possession of the land (“the notice period”).
3 The notice period must not end earlier than the end of the period of three months beginning with the day on which the notice is given.
4 The notice must specify the period for which the acquiring authority is to take temporary possession of the land.
5 For the purposes of this section an acquiring authority is to be treated as taking temporary possession of land at the beginning of the first day of any period of temporary possession.
6 The notice period may be reduced by agreement between the acquiring authority and all persons to whom a notice must be given under subsection (1).
7 An acquiring authority must comply with this section again in relation to each subsequent period of temporary possession even if there is to be no gap between periods.
8 Where the authorising instrument mentioned in section 19 is a compulsory purchase order, a notice of intended entry under this section may not be served after the end of the period of three years beginning with the day on which the authorising instrument becomes operative.
9 In any other case, a notice of intended entry under this section may not be served after the end of the period of five years beginning with the day on which the authorising instrument becomes operative.
10 For the purposes of subsection (1), a person entitled to the benefit of an obligation under a conservation covenant is to be treated as having an interest in the land to which the obligation relates.

21 Counter-notice

1 This section applies where an acquiring authority gives a notice of intended entry under section 20 in relation to land to a person (the “owner”) who—
a has a leasehold interest in, and the right to occupy, the land, or
b has the freehold interest in the land.
2 The owner may give the acquiring authority a counter-notice which provides that the total period of time for which the land may be subject to temporary possession is limited to—
a 12 months where the land is or is part of a dwelling, or
b 6 years in any other case.
3 If the owner falls within subsection (1)(a), the owner may instead give the acquiring authority a counter-notice which provides that the authority may not take temporary possession of the land.
4 A counter-notice under subsection (2) or (3) must be given within the period of 28 days beginning with the day on which the notice of intended entry was given.
5 On receiving a counter-notice under subsection (2), the acquiring authority must decide whether to—
a accept the counter-notice,
b withdraw the notice of intended entry, or
c proceed as if the land were subject to compulsory acquisition.
6 On receiving a counter-notice under subsection (3), the acquiring authority must decide whether to—
a accept the counter-notice, or
b proceed as if the land were subject to compulsory acquisition.
7 The acquiring authority must give a notice of its decision in response to a counter-notice to the owner within the period of 28 days beginning with the day on which the counter-notice was given.
8 If the acquiring authority decides to proceed as if the land were subject to compulsory acquisition—
a the instrument which authorised temporary possession of the land is to be treated as authorising the compulsory acquisition of the owner's interest in the land (as well as the temporary possession of the land, if there are other interests in it), and
b the authority may proceed as if it had given any notice or taken any step required in relation to the authorisation or confirmation of the instrument.
9 See Schedule 2A to the Compulsory Purchase Act 1965 and Schedule A1 to the Compulsory Purchase (Vesting Declarations) Act 1981 for options available to the owner if, in response to a counter-notice under this section, the acquiring authority decides to purchase the owner's interest in part of a house, building or factory.
10 Nothing in this section prevents an acquiring authority acquiring land compulsorily after accepting a counter-notice or withdrawing a notice of intended entry in respect of that land.

22 Refusal to give up possession

Section 13 of the Compulsory Purchase Act 1965 (refusal to give up possession of land to acquiring authority) applies in relation to temporary possession by virtue of section 18(2) of this Act as if—
a the reference to “this Act” in subsection (1) were a reference to section 18(2) of this Act, and
b the references to taking possession of land were references to taking temporary possession of land compulsorily by virtue of section 18(2) of this Act.

23 Compensation

1 This section applies if an acquiring authority takes or is authorised to take temporary possession of land compulsorily by virtue of section 18(2).
2 A person (a “claimant”) who has an interest in or a right to occupy the land is entitled to receive compensation from the authority for any loss or injury the claimant sustains as a result.
3 A person (a “beneficial claimant”) is entitled to receive compensation from the authority for any loss or injury the beneficial claimant sustains as a result of the authority—
a interfering with a relevant right or interest annexed to land belonging to the beneficial claimant, or
b breaching a restriction as to the user of land arising by virtue of a contract where—
i the beneficial claimant is a party to the contract, or
ii the restriction benefits land which belongs to the beneficial claimant.
4 Where the claimant is carrying on a trade or business on the land, the compensation to which the claimant is entitled includes compensation for any loss which the claimant sustains by reason of the disturbance of the trade or business consequent upon the claimant having to quit the land for the period of the temporary possession.
5 In estimating loss for the purposes of subsection (4) regard is to be had—
a to the period for which the land occupied by the claimant may reasonably have been expected to be available for the purposes of the claimant's trade or business,
b to the terms on which the land may reasonably have been expected to be available for those purposes, and
c to the availability of other land suitable for those purposes during the period of temporary possession.
5A For the purposes of subsections (2) and (3), the person is not entitled to compensation under this section by virtue of being the person entitled to the benefit of an obligation under a conservation covenant.
6 For the purposes of section 9 of the Limitation Act 1980, a cause of action for compensation under this section which, apart from this subsection, would accrue before or during a period of compulsory temporary possession for which notice is given under section 20 is to be treated as accruing on the last day of the period.
7 Compensation under this section in relation to a particular head of loss or injury carries interest from the day after the last day on which that loss or injury occurs.
8 The interest is to be at the rate prescribed by regulations under section 32 of the Land Compensation Act 1961 in relation to the compulsory acquisition of land.
9 Any dispute about compensation payable under this section may be referred to and determined by the Upper Tribunal.
10 In this Chapter “relevant right or interest” means any easement, liberty, privilege, right or advantage annexed to land and adversely affecting other land (including any natural right to support).

24 Advance payments

1 This section applies where a person (a “claimant”) to whom compensation is or will be payable under section 23 makes a request in accordance with subsection (3).
2 The acquiring authority—
a must make an advance payment on account of the compensation if it has given a notice of intended entry under section 20 in relation to the land in respect of which the claimant is or will be entitled to compensation, but
b may not do so if it has not given such a notice.
3 A request for advance payment must be made in writing by the claimant and must include—
a details of the basis on which the claimant is or is going to be entitled to compensation, and
b information which is sufficient to enable the acquiring authority to estimate the amount of the compensation in respect of which the advance payment is to be made.
4 Before the end of the period of 28 days beginning with the day on which the acquiring authority receives a request under subsection (3), the authority must—
a determine whether it has enough information to estimate the amount of compensation, and
b if it needs more information, require the claimant to provide it.
5 The amount of an advance payment is to be equal to 90% of—
a if the acquiring authority and the claimant have agreed on the amount of the compensation, the agreed amount, or
b in any other case, an amount equal to the compensation as estimated by the acquiring authority.
6 An advance payment must be made—
a before the end of the day on which the authority takes temporary possession of the land, or
b if later, before the end of the period of two months beginning with the day on which the authority—
i receives the request for the advance payment, or
ii receives any further information required under subsection (4)(b).
7 If, after making an advance payment on the basis of its estimate of the compensation, the acquiring authority considers that its estimate was too low, the authority must pay the claimant the balance of the amount of the advance payment calculated on the basis of the authority's new estimate of the compensation.
8 Where the total amount of any payments under this section made on the basis of the acquiring authority's estimate of the compensation exceeds the compensation as finally determined or agreed, the excess is to be repaid.
9 If, after a payment under this section has been made to a person, it is discovered that the person was not entitled to it, the person must repay it.

25 Interest on advance payments of compensation paid late

1 If an acquiring authority is required by section 24(2) to make an advance payment of compensation but pays some or all of it after the day or (as the case may be) the end of the period specified in section 24(6), the authority must pay interest on the amount which is paid after that period (the “unpaid amount”).
2 Interest under subsection (1) accrues on the unpaid amount for the period beginning with the day after the day or (as the case may be) the end of the period specified in section 24(6).
3 If the total amount of any advance payment made under section 24 is greater than the compensation as finally determined or agreed (the “actual amount”), the claimant must repay any interest paid under this section that is attributable to the amount by which the advance payment exceeded the actual amount.
4 The Treasury must by regulations specify the rate of interest for the purposes of subsection (1).
5 Regulations under subsection (4) may contain further provision in connection with the payment of interest under subsection (1).

26 Consequential amendments

1 The Town and Country Planning Act 1990 is amended in accordance with subsections (2) to (7).
2 In section 150 (notices requiring purchase of blighted land), in subsection (1)(b), for “or paragraph 24” substitute “ , paragraph 24 or paragraph 24A ”.
3 In section 151 (counter-notice objecting to blight notices)—
a in subsection (4)(b), after “to acquire” insert “ or (in the case of land to which paragraph 24A of Schedule 13 applies) take temporary possession of ”, and
b in subsection (8), for “to acquire that land” substitute “ to acquire or (in the case of land to which paragraph 24A of Schedule 13 applies) to take temporary possession of that land ”.
4 In section 155 (effect on powers of compulsory acquisition of counter-notice disclaiming intention to acquire)—
a in the heading, after “acquire” insert etc., and
b in subsection (2)—
i in paragraph (a), after “appropriate enactment” insert “ , or, in a case to which paragraph 24A of Schedule 13 applies, the temporary possession of land has been authorised by the appropriate enactment, ”,
ii in the closing words, after “that order” insert “ or appropriate enactment, ”, and
iii after “claimant in” insert “ , or the temporary possession of, ”.
5 In section 169 (meaning of “appropriate authority” in relation to blighted land), in subsection (1)—
a the words from “by whom” to the end become paragraph (a), and
b after that paragraph insert
6 In section 170 (meaning of “appropriate enactment” in relation to blighted land), after subsection (8B) insert—
7 In Schedule 13 (list of categories of land which are blighted land as a result of planning proposals etc. by public authorities), after paragraph 24 insert—
8 In section 172 of the Housing and Planning Act 2016 (right to enter and survey land in connection with proposal to acquire land etc.)—
a in subsection (1)—
i the words from “to” to the end become paragraph (a), and
ii after paragraph (a) insert
” and
I23b in subsection (6) for the words from “acquiring authority” to the end of the subsection substitute

27 Powers of acquiring authority in relation to land

1 Subject to subsection (4) and to any regulations under section 29, where an acquiring authority takes temporary possession of land compulsorily by virtue of section 18(2), the authority may use the land as if it had acquired all interests in it.
2 In particular, the acquiring authority may—
a remove or erect buildings or other works, and
b remove any vegetation,
to the extent that it would be able to do so if it had acquired all interests in the land.
3 The acquiring authority may use land as described in subsection (1) even if this involves—
a interfering with a relevant right or interest, F7...
b breaching a restriction as to the user of land arising by virtue of a contract , or
c causing a person to be in breach of an obligation under a conservation covenant relating to the land.
4 But the acquiring authority may use the land only for the purposes for which temporary possession was required, as described in the authorising instrument (see section 19(7)(b)).
4A The acquiring authority is not bound by an obligation under a conservation covenant relating to the land by virtue of acquiring a right to use the land under this section.
5 Nothing in this section authorises an interference with—
a a right of way on, under or over land that is a protected right, or
b a right of laying down, erecting, continuing or maintaining apparatus on, under or over land if it is a protected right.
6 Nothing in this section authorises—
a an interference with a relevant right or interest annexed to land belonging to the National Trust which is held by the National Trust inalienably, F9...
b a breach of a restriction as to the user of land which does not belong to the National Trust—
i arising by virtue of a contract to which the National Trust is a party, or
ii benefiting land which does belong to the National Trust , or
c a use of land that causes a person (or, if the person were to permit or suffer the use, would cause the person) to be in breach of an obligation under a conservation covenant relating to the land owed to the National Trust.
7 For the purposes of subsection (6)—
a the National Trust” means the National Trust for Places of Historic Interest or Natural Beauty incorporated by the National Trust Act 1907, and
b land is held by the National Trust “inalienably” if it is inalienable under section 21 of the National Trust Act 1907 or section 8 of the National Trust Act 1939.
8 In this section—
  • protected right” means—
    1. a right vested in, or belonging to, a statutory undertaker for the purpose of carrying on its statutory undertaking, or
    2. a right conferred by, or in accordance with, the electronic communications code on the operator of an electronic communications code network (and expressions used in this paragraph have the meaning given by paragraph 1(1) of Schedule 17 to the Communications Act 2003);
  • statutory undertaker” means a person who is, or who is deemed to be, a statutory undertaker for the purposes of any provision of Part 11 of the Town and Country Planning Act 1990;
  • statutory undertaking” is to be read in accordance with section 262 of the Town and Country Planning Act 1990 (meaning of “statutory undertakers”).

28 Impact of temporary possession on tenancies etc

1 Subsection (2) applies where an acquiring authority takes temporary possession under section 18(2) of land subject to a tenancy.
2 A person is not to be treated as being in breach of—
a any term of the tenancy, or
b any other obligation associated with the tenancy or the land subject to temporary possession,
to the extent that the person cannot reasonably comply with the term or other obligation as a result of the temporary possession.
3 Subsection (2) does not affect terms or obligations about—
a the length of the tenancy, or
b the payment of rent.
4 Subsection (5) applies where—
a an acquiring authority takes temporary possession of land subject to a tenancy to which Part 2 of the Landlord and Tenant Act 1954 (security of tenure for business tenants) applies immediately before the period of temporary possession,
b the tenancy expires during the period of temporary possession, and
c prior to the period of temporary possession the tenant notifies in writing both the acquiring authority and the landlord that the tenant intends to resume occupation of the land after the period of temporary possession.
5 For the purposes of Part 2 of the Landlord and Tenant Act 1954 the tenant is to be deemed to continue to occupy the land in accordance with the tenancy mentioned in subsection (4)(b), and any tenancy which succeeds that tenancy, despite the period of temporary possession.
6 But if the tenant notifies in writing both the acquiring authority and the landlord that the tenant no longer intends to resume occupation of the land after the period of temporary possession subsection (5) ceases to apply.
7 In this section “tenancy” includes a sub-tenancy.

I1929 Supplementary provisions

1 The appropriate national authority must by regulations make provision about—
a the reinstatement of land subject to a period of temporary possession, and
b the resolution by an independent person of disputes about reinstatement.
2 The Secretary of State may by regulations exclude the application of any provision of this Chapter in relation to a person who is an acquiring authority as a result of an authorisation by virtue of—
a section 11, 12 or 12A of the Pipe-lines Act 1962 (compulsory purchase of land or rights over land in connection with pipe-lines),
b section 12 or 13 of the Gas Act 1965 (compulsory purchase of rights in relation to storage of gas etc),
c paragraph 1 of Schedule 3 to the Gas Act 1986 (compulsory purchase of land by gas transporter), or
d paragraph 1 of Schedule 3 to the Electricity Act 1989 (compulsory purchase of land by licence holder).
3 The appropriate national authority may by regulations make further provision in relation to—
a the authorisation and exercise of the power to take temporary possession of land by virtue of section 18(2), and
b the circumstances in which an acquiring authority may be authorised to acquire land after being authorised to take temporary possession of it.
4 Regulations under subsection (3) may for example—
a make provision that appears to the appropriate national authority to be necessary or expedient for giving full effect to a provision of this Chapter in relation to particular cases or types of case, including by modifying that provision so that it is effective in relation to those cases or types of case,
b limit the period for which an acquiring authority may take temporary possession of land,
c limit the circumstances in which an acquiring authority may take temporary possession of land,
d make provision about the use by an acquiring authority of land of which it has taken temporary possession (for example, by limiting what an acquiring authority may do or by requiring an acquiring authority to do certain things),
e limit the types of land which may be subject to temporary possession in specified circumstances,
f require an acquiring authority to provide specified information relating to a period of temporary possession to specified persons before, during or after the period,
g make provision in relation to the sale by a person with an interest in land where that land is or may be subject to temporary possession, and
h make provision for a person who has a right to occupy land subject to temporary possession to be deemed to occupy that land for specified purposes during the period of temporary possession.
5 Before making regulations under this section the Secretary of State or the Welsh Ministers, as the case may be, must carry out a public consultation.
6 In this section—
  • appropriate national authority” means—
    1. in relation to cases where the Welsh Ministers are the acquiring authority or the confirming authority, the Welsh Ministers, and
    2. in all other cases, the Secretary of State;
  • confirming authority” means the authority having power to authorise the acquiring authority to take temporary possession of land;
  • specified” means specified in regulations under subsection (3).

I2030 Interpretation

In this Chapter—
  • acquiring authority” has the meaning given in section 18(1);
  • the notice period” has the meaning given in section 20(2);
  • obligation under a conservation covenant” has the same meaning as in Part 7 of the Environment Act 2021;
  • possession” means exclusive occupation;
  • relevant right or interest” has the meaning given by section 23(10).

31 Application to Crown land

1 This Chapter applies in relation to Crown land.
2 An acquiring authority may exercise the power conferred by section 18(2) in relation to Crown land only if the acquiring authority has the consent of the appropriate authority.
3 In this section “Crown land” and “the appropriate authority” have the meanings given in section 293 of the Town and Country Planning Act 1990.

CHAPTER 2 Other provisions relating to compulsory purchase

I2432 No-scheme principle

1 The Land Compensation Act 1961 is amended in accordance with subsections (2) to (4).
2 In section 5, after rule (2) insert—
3 For sections 6 to 9 (provisions about how scheme is to be disregarded when assessing compensation in respect of compulsory acquisition) substitute—
4 Omit—
a section 15 (planning permission to be assumed for acquiring authority's proposals), and
b Schedule 1 (actual or prospective development relevant for purposes of sections 6, 7 and 8).
5 In section 6(3) of the Land Compensation Act 1973 (reduction of compensation where land is benefited)—
a for “section 6” substitute “ section 6A ”, and
b for “section 7” substitute “ section 6B ”.
6 In section 78 of the Housing Act 1988 (supplementary provisions relating to vesting, acquisition and compensation) omit subsections (3) and (4).

I2533 Repeal of Part 4 of the Land Compensation Act 1961

1 In the Land Compensation Act 1961 omit—
a Part 4 (compensation where permission for additional development granted after acquisition), and
b Schedule 3 (application of Part 4 to certain cases).
2 In section 38(1) of that Act (service of notices) omit “or Part IV”.
3 In section 141 of the Local Government, Planning and Land Act 1980 (vesting by order of land in urban development corporation) omit subsection (5A) (no compensation payable under Part 4 of the Land Compensation Act 1961 by virtue of such an order).
4 In consequence of the amendments made by this section the following are repealed or revoked—
a section 66 of the Planning and Compensation Act 1991;
b Schedule 14 to that Act;
c paragraph 25 of Schedule 15 to that Act;
d paragraph 14 of Schedule 14 to the Government of Wales Act 1998;
e paragraph 15 of Schedule 1 to the Fire and Rescue Services Act 2004;
f the first paragraph 3 in Part 1 of Schedule 2 to the Welsh Development Agency (Transfer of Functions to the National Assembly for Wales and Abolition) Order 2005 (SI 2005/3226);
g paragraph 2 of Schedule 8 to the Housing and Regeneration Act 2008;
h paragraph 1 of Schedule 2 to the Localism Act 2011 (Consequential Amendments) Order 2012 (SI 2012/961).
5 The repeals and revocations made by this section have effect in relation only to an acquisition or sale of an interest in land in relation to which the date of completion (within the meaning of Part 4 of the Land Compensation Act 1961) falls on or after the day on which this section comes into force.

I2634 Time limit for confirmation notices

1 In section 15 of the Acquisition of Land Act 1981 (notices to be served and published etc after confirmation of compulsory purchase order) after subsection (3) insert—
2 The amendment made by this section applies only in relation to a compulsory purchase order which is confirmed after this section comes into force.

I2735 Compensation for disturbance

For section 47 of the Land Compensation Act 1973 (compensation in respect of land subject to business tenancy) substitute—

I2836 GLA, MDCs and TfL: joint acquisition of land

1 The Greater London Authority Act 1999 is amended as follows.
2 After section 403 insert—
3 In paragraph 20 of Schedule 11 (limitations on Transport for London's power to acquire land compulsorily), after “provided by” insert “ section 403A, 403B or ”.

I2137 Overriding easements: land held on behalf of GLA or TfL

1 The Housing and Planning Act 2016 is amended in accordance with subsections (2) to (4).
2 In section 203 (power to override easements and other rights)—
a in the opening words of subsection (2)(b), for “13 July 2016” substitute “ the relevant day ”,
b in subsection (2)(b)(i), after “specified authority” insert “ or a specified company acting on behalf of a specified authority ”,
c in the opening words of subsection (5)(b), for “13 July 2016” substitute “ the relevant day ”, and
d in subsection (5)(b)(i), after “specified authority” insert “ or a specified company acting on behalf of a specified authority ”.
3 In section 204 (compensation for overridden easements), for subsection (4) substitute—
4 In section 205 (interpretation of sections 203 and 204)—
a in the definition of “other qualifying land”, in the opening words of paragraph (g), after “regeneration,” insert “ or vested in or acquired by a company or body through which the Greater London Authority exercises functions in relation to housing or regeneration, ”,
b in the definition of “qualifying authority”—
i for the words from “authority in” to “or which” substitute “ person in whom the land was vested, or who ”, and
ii at the end insert “ (but, for the purposes of section 203(3)(c) and (6)(c), where that person is a company or body through which the Greater London Authority exercises functions in relation to housing or regeneration, the qualifying authority is the Greater London Authority) ”,
c after the definition of “qualifying authority” insert—
, and
d after the definition of “specified authority” insert—
.
5 In the Housing and Planning Act 2016 (Commencement No. 2, Transitional Provisions and Savings) Regulations 2016 (S.I. 2016/733), the following regulations are revoked—
a regulation 10 (savings in relation to company through which Greater London Authority exercises functions), and
b regulation 12(3) (substitution of actual date for reference to commencement date).

I4638 Timing of advance payments of compensation

1 The Land Compensation Act 1973 is amended as follows.
2 In section 52 (right to advance payment of compensation)—
a in subsection (4)(b)—
i omit the “or” before sub-paragraph (ii), and
ii at the end insert
, and
b in subsection (4ZA)(b)—
i omit the “or” before sub-paragraph (ii), and
ii at the end insert
3 In section 52ZC (land subject to mortgage: supplementary provisions)—
a in subsection (3A)(b)—
i omit the “or” before sub-paragraph (ii), and
ii at the end insert
, and
b in subsection (3B)(b)—
i omit the “or” before sub-paragraph (ii), and
ii at the end insert

39 Interest on advance payments of compensation

In section 52A of the Land Compensation Act 1973 (right to interest where advance payment made), in subsection (2B), for “the paid amount” substitute “ the amount in respect of which the authority is required to pay interest under section 52B ”.

40 Interest on payments to mortgagee paid late

1 Section 52B of the Land Compensation Act 1973 (interest on advance payments of compensation paid late) is amended as follows.
2 In the heading, after “compensation” insert “etc.
3 In subsection (1)—
a after “(1B)” insert “ , 52ZA(3) or 52ZB(3) ”,
b after “compensation” insert “ or (as the case may be) a payment to a mortgagee ”, and
c after “interest” insert “ to the claimant ”.
4 In subsection (2), after “(4ZA)” insert “ or (as the case may be) section 52ZC(3A) or (3B) ”.
5 In subsection (3)—
a for “the amount of the advance payment” substitute “ the total amount which the acquiring authority pays under section 52, 52ZA or 52ZB in respect of the claimant (the “paid amount”) ”, and
b for “by which the advance payment” substitute “ by which the paid amount ”.

I2241 Compensation for temporary severance of land after vesting declaration

In Schedule A1 to the Compulsory Purchase (Vesting Declarations) Act 1981 (counter-notice requiring purchase of land not in general vesting declaration), in paragraph 16, after sub-paragraph (3) insert—

CHAPTER 3 Consequential provision

42 I6Consequential provision

1 The Secretary of State may by regulations make provision in consequence of any provision of this Part.
2 Regulations under subsection (1) may amend, repeal or revoke any enactment.
3 In subsection (2) “enactment” includes—
a an enactment contained in subordinate legislation within the meaning of the Interpretation Act 1978, and
b an enactment contained in, or in an instrument made under, a Measure or Act of the National Assembly for Wales.

Part 3 Final provisions

43 I7Financial provisions

The following are to be paid out of money provided by Parliament—
a any expenditure incurred under or by virtue of this Act by a Minister of the Crown, a person holding office under Her Majesty or a government department, and
b any increase attributable to this Act in the sums payable under any other Act out of money so provided.

44 I8Regulations

1 Regulations under this Act are to be made by statutory instrument.
2 A statutory instrument containing (whether alone or with any other provision) any of the following regulations may not be made unless a draft of the instrument has been laid before, and approved by a resolution of, each House of Parliament—
a regulations under section 29(1), (2) or (3) made by the Secretary of State;
b regulations under section 42(1) which amend or repeal a provision of primary legislation.
3 A statutory instrument containing (whether alone or with any other provision) regulations under section 29(1) or (3) made by the Welsh Ministers may not be made unless a draft of the instrument has been laid before, and approved by a resolution of, the National Assembly for Wales.
4 A statutory instrument containing any of the following regulations and to which subsection (2) does not apply is subject to annulment in pursuance of a resolution of either House of Parliament—
a regulations under section 25(4);
b regulations under section 42(1) which do not amend or repeal a provision of primary legislation.
5 Regulations under this Act—
a may make different provision for different purposes or areas;
b may make provision which applies generally or for particular purposes or areas;
c may make transitional, transitory or saving provision;
d may make incidental, supplementary or consequential provision.
6 If a draft of regulations under section 29(3) would, apart from this subsection, be treated as a hybrid instrument for the purposes of the Standing Orders of either House of Parliament, it is to proceed in that House as if it were not a hybrid instrument.
7 In this section “primary legislation” means—
a an Act of Parliament, or
b a Measure or Act of the National Assembly for Wales.

45 I9Extent

1 This Act extends to England and Wales only, subject to subsection (2).
2 Section 42 and this Part extend to England and Wales, Scotland and Northern Ireland.

46 I10Commencement

1 This Act comes into force on such day as the Secretary of State appoints by regulations, subject to subsection (3).
2 Regulations under subsection (1) may appoint different days for different purposes or areas.
3 The following provisions come into force on the day on which this Act is passed—
a section 2, for the purposes only of enabling the Secretary of State to make provision by development order under paragraph 8(6) of Schedule 1 to the Town and Country Planning Act 1990;
b sections 4, 9, 12 and 13 and Schedule 1, to the extent that they confer power on the Secretary of State to make regulations;
c section 15;
d section 17;
e section 42;
f this Part.
4 The Secretary of State may by regulations make such transitional, transitory or saving provision as the Secretary of State considers appropriate in connection with the coming into force of any provision of this Act.

47 I11Short title

This Act may be cited as the Neighbourhood Planning Act 2017.

SCHEDULES

SCHEDULE 1 

New Schedule A2 to the Planning and Compulsory Purchase Act 2004

Section 4

I12I441This is the new Schedule A2 to the Planning and Compulsory Purchase Act 2004 referred to in section 4—

SCHEDULE 2 

County councils' default powers in relation to development plan documents

Section 10

I321The Planning and Compulsory Purchase Act 2004 is amended as follows.
I332Schedule A1 (default powers exercisable by Mayor of London or combined authority) is amended in accordance with paragraphs 3 to 8.
I343In the heading for “or combined authority” substitute “ , combined authority or county council ”.
I354After paragraph 7 insert—
I365
1 Paragraph 8 is amended as follows.
2 In sub-paragraph (1)—
a omit the “or” at the end of paragraph (a), and
b at the end of paragraph (b) insert
3 In sub-paragraph (2)(a)—
a for “or 6(4)(a)” substitute “ , 6(4)(a) or 7C(4)(a) ”, and
b for “or the combined authority” substitute “ , the combined authority or the upper-tier county council ”.
4 In sub-paragraph (3)(a) for “or the combined authority” substitute “ , the combined authority or the upper-tier county council ”.
5 In sub-paragraph (5) for “or 6(4)(a)” substitute “ , 6(4)(a) or 7C(4)(a) ”.
6 In sub-paragraph (7)—
a in paragraph (b) for “or 6(4)(a)” substitute “ , 6(4)(a) or 7C(4)(a) ”, and
b in the words following that paragraph for “or the combined authority” substitute “ , the combined authority or the upper-tier county council ”.
I376In paragraph 9(8) for “or the combined authority” substitute “ , the combined authority or the upper-tier county council ”.
I387In paragraph 12—
a for “or the combined authority” substitute “ , the combined authority or the upper-tier county council ”, and
b for “or the authority” substitute “ , the authority or the council ”.
I398In paragraph 13(1)—
a for “or a combined authority” substitute “ , a combined authority or an upper-tier county council ”, and
b for “or the authority” substitute “ , the authority or the council ”.
I409In section 17(8) (document a local development document only if adopted or approved) after paragraph (d) insert—
I4110In section 27A (default powers exercisable by Mayor of London or combined authority) for “or combined authority” in both places substitute “ , combined authority or county council ”.

SCHEDULE 3 

Planning conditions: consequential amendments

Section 14

I511The Town and Country Planning Act 1990 is amended as follows.
2In section 70 (determination of applications: general considerations), after subsection (3) insert—
I523In section 72 (conditional grant of planning permission), after subsection (5) insert—
I534In section 73 (determination of applications to develop land without compliance with conditions previously attached), after subsection (2) insert—
I545In section 90(3) (effect of deemed planning permission) after “except” insert “ section 100ZA and ”.
6In section 93 (provisions supplementary to sections 91 and 92), after subsection (4) insert—
7In section 141 (action by Secretary of State in relation to purchase notice), after subsection (5) insert—
I558In section 177 (grant or modification of planning permission on appeals against enforcement notices), after subsection (4) insert—

Footnotes

  1. I1
    S. 2 in force for specified purposes at Royal Assent, see s. 46
  2. I2
    S. 4 in force for specified purposes at Royal Assent, see s. 46
  3. I3
    S. 9 in force on for specified purposes at Royal Assent, see s. 46
  4. I4
    S. 12 in force for specified purposes at Royal Assent, see s. 46
  5. I5
    S. 13 in force for specified purposes at Royal Assent, see s. 46
  6. I6
    S. 2 in force for specified purposes at Royal Assent, see s. 46
  7. I7
    S. 2 in force for specified purposes at Royal Assent, see s. 46
  8. I8
    S. 2 in force for specified purposes at Royal Assent, see s. 46
  9. I9
    S. 2 in force for specified purposes at Royal Assent, see s. 46
  10. I10
    S. 2 in force for specified purposes at Royal Assent, see s. 46
  11. I11
    S. 2 in force for specified purposes at Royal Assent, see s. 46
  12. I12
    Sch. 1 in force for specified purposes at Royal Assent, see s. 46
  13. I13
    S. 1 in force at 19.7.2017 by S.I. 2017/767, reg. 2(a)
  14. I14
    S. 3 in force at 19.7.2017 by S.I. 2017/767, reg. 2(b)
  15. I15
    S. 11 in force at 19.7.2017 by S.I. 2017/767, reg. 2(c)
  16. I16
    S. 12 in force at 19.7.2017 in so far as not already in force by S.I. 2017/767, reg. 2(d)
  17. I17
    S. 14 in force at 19.7.2017 for specified purposes by S.I. 2017/767, reg. 2(e)
  18. I18
    S. 16 in force at 19.7.2017 by S.I. 2017/767, reg. 2(f)
  19. I19
    S. 29 in force at 19.7.2017 by S.I. 2017/767, reg. 2(g)
  20. I20
    S. 30 in force at 19.7.2017 by S.I. 2017/767, reg. 2(h)
  21. I21
    S. 37 in force at 19.7.2017 by S.I. 2017/767, reg. 2(i)
  22. I22
    S. 41 in force at 19.7.2017 by S.I. 2017/767, reg. 2(j)
  23. F1
    Words in s. 37(4)(c) substituted (19.7.2017) by The Neighbourhood Planning Act 2017 (Commencement No. 1) Regulations 2017 (S.I. 2017/767), reg. 3
  24. I23
    S. 26(8)(b) in force at 22.9.2017 by S.I. 2017/936, reg. 3(a) (with reg. 5)
  25. I24
    S. 32 in force at 22.9.2017 by S.I. 2017/936, reg. 3(b) (with reg. 4)
  26. I25
    S. 33 in force at 22.9.2017 by S.I. 2017/936, reg. 3(c)
  27. I26
    S. 34 in force at 22.9.2017 by S.I. 2017/936, reg. 3(d)
  28. I27
    S. 35 in force at 22.9.2017 by S.I. 2017/936, reg. 3(e) (with reg. 4)
  29. I28
    S. 36 in force at 22.9.2017 by S.I. 2017/936, reg. 3(f)
  30. F2
    Words in s. 32(3) substituted (22.9.2017) by The Neighbourhood Planning Act 2017 (Commencement No. 2) Regulations 2017 (S.I. 2017/936), reg. 6
  31. F3
    Words in s. 32(3) substituted (22.9.2017) by The Neighbourhood Planning Act 2017 (Commencement No. 2) Regulations 2017 (S.I. 2017/936), reg. 7
  32. I29
    S. 8(1)(3) in force at 16.1.2018 by S.I. 2018/38, reg. 2(a)
  33. I30
    S. 9 in force at 16.1.2018 in so far as not already in force by S.I. 2018/38, reg. 2(b)
  34. I31
    S. 10 in force at 16.1.2018 by S.I. 2018/38, reg. 2(c)
  35. I32
    Sch. 2 para. 1 in force at 16.1.2018 by S.I. 2018/38, reg. 2(c)
  36. I33
    Sch. 2 para. 2 in force at 16.1.2018 by S.I. 2018/38, reg. 2(c)
  37. I34
    Sch. 2 para. 3 in force at 16.1.2018 by S.I. 2018/38, reg. 2(c)
  38. I35
    Sch. 2 para. 4 in force at 16.1.2018 by S.I. 2018/38, reg. 2(c)
  39. I36
    Sch. 2 para. 5 in force at 16.1.2018 by S.I. 2018/38, reg. 2(c)
  40. I37
    Sch. 2 para. 6 in force at 16.1.2018 by S.I. 2018/38, reg. 2(c)
  41. I38
    Sch. 2 para. 7 in force at 16.1.2018 by S.I. 2018/38, reg. 2(c)
  42. I39
    Sch. 2 para. 8 in force at 16.1.2018 by S.I. 2018/38, reg. 2(c)
  43. I40
    Sch. 2 para. 9 in force at 16.1.2018 by S.I. 2018/38, reg. 2(c)
  44. I41
    Sch. 2 para. 10 in force at 16.1.2018 by S.I. 2018/38, reg. 2(c)
  45. I42
    S. 2 in force at 31.1.2018 in so far as not already in force by S.I. 2018/38, reg. 3(a)
  46. I43
    S. 4 in force at 31.1.2018 in so far as not already in force by S.I. 2018/38, reg. 3(b)
  47. I44
    Sch. 1 para. 1 in force at 31.1.2018 in so far as not already in force by S.I. 2018/38, reg. 3(b)
  48. I45
    S. 5 in force at 31.1.2018 by S.I. 2018/38, reg. 3(c)
  49. I46
    S. 38 in force at 6.4.2018 by S.I. 2018/252, reg. 3 (with reg. 4)
  50. C1
    Act excluded in part (31.5.2018) by The Silvertown Tunnel Order 2018 (S.I. 2018/574), arts. 1(2), 3(1)(p)
  51. I47
    S. 6 in force at 31.7.2018 by S.I. 2018/38, reg. 4(a)
  52. I48
    S. 13(2) in force at 31.7.2018 in so far as not already in force by S.I. 2018/38, reg. 4(b) (with reg. 5)
  53. C2
    Pt. 2 Ch. 1 excluded (26.9.2018) by The Network Rail (Felixstowe Branch Line Improvements Level Crossings Closure) Order 2018 (S.I. 2018/937), arts. 1, 28
  54. I49
    S. 14(1)(3) in force at 1.10.2018 for specified purposes by S.I. 2018/567, reg. 3(a)
  55. I50
    S. 14(4) in force at 1.10.2018 for specified purposes by S.I. 2018/567, reg. 3(b)
  56. I51
    Sch. 3 para. 1 in force at 1.10.2018 by S.I. 2018/567, reg. 3(b)
  57. I52
    Sch. 3 para. 3 in force at 1.10.2018 by S.I. 2018/567, reg. 3(b)
  58. I53
    Sch. 3 para. 4 in force at 1.10.2018 by S.I. 2018/567, reg. 3(b)
  59. I54
    Sch. 3 para. 5 in force at 1.10.2018 by S.I. 2018/567, reg. 3(b)
  60. I55
    Sch. 3 para. 8 in force at 1.10.2018 by S.I. 2018/567, reg. 3(b)
  61. C3
    Act excluded in part (3.10.2018) by The A19/A184 Testos Junction Alteration Development Consent Order 2018 (S.I. 2018/994), arts. 1, 2(7) (with arts. 3(3), 5)
  62. C4
    Pt. 2 Ch. 1 excluded (12.10.2018) by The Eggborough Gas Fired Generating Station Order 2018 (S.I. 2018/1020), arts. 1, 26(12) (with arts. 6, 42)
  63. C5
    Act excluded in part (13.3.2019) by The Port of Tilbury (Expansion) Order 2019 (S.I. 2019/359), arts. 1, 3(1)(g) (with arts. 55, 56)
  64. C6
    Act excluded in part (3.4.2019) by The Millbrook Gas Fired Generating Station Order 2019 (S.I. 2019/578), arts. 1, 27(13), 28(12)
  65. C7
    Act excluded in part (7.5.2019) by The Midland Metro (Birmingham City Centre Extension, etc.) (Edgbaston Extension Land Acquisition) Order 2019 (S.I. 2019/882), arts. 1, 3 (with art. 18)
  66. I56
    S. 8(2) in force at 4.7.2019 by S.I. 2019/1081, reg. 2
  67. C8
    Act excluded in part (10.10.2019) by The Abergelli Power Gas Fired Generating Station Order 2019 (S.I. 2019/1268), arts. 1, 28(13)
  68. C9
    Act excluded in part (10.10.2019) by The Abergelli Power Gas Fired Generating Station Order 2019 (S.I. 2019/1268), arts. 1, 29(12)
  69. C10
    Act excluded in part (25.10.2019) by The Drax Power (Generating Stations) Order 2019 (S.I. 2019/1315), arts. 1, 8(1)
  70. C11
    Act excluded in part (30.10.2019) by The Northampton Gateway Rail Freight Interchange Order 2019 (S.I. 2019/1358), arts. 1, 45(2) (with art. 45(7), Sch. 13 Pt. 1 para. 19)
  71. C12
    Act excluded in part (27.2.2020) by The A30 Chiverton to Carland Cross Development Consent Order 2020 (S.I. 2020/121), arts. 1, 4 (with art. 3(1))
  72. C13
    Act excluded in part (4.3.2020) by The Midland Metro (Birmingham Eastside Extension) Order 2020 (S.I. 2020/141), arts. 1, 6 (with arts. 47, 48, Sch. 10 para. 19)
  73. C14
    Pt. 2 Ch. 1 excluded (14.4.2020) by The Reinforcement to the North Shropshire Electricity Distribution Network Order 2020 (S.I. 2020/325), arts. 1, 27(13) (with arts. 7, 27(8))
  74. C15
    Act excluded in part (30.4.2020) by The A585 Windy Harbour to Skippool Highway Development Consent Order 2020 (S.I. 2020/402), arts. 1, 29(12) (with arts. 5, 44)
  75. C16
    Act excluded in part (30.4.2020) by The A585 Windy Harbour to Skippool Highway Development Consent Order 2020 (S.I. 2020/402), arts. 1, 30(12) (with arts. 5, 44)
  76. C17
    Pt. 2 Ch. 1 excluded (14.4.2020) by The Reinforcement to the North Shropshire Electricity Distribution Network Order 2020 (S.I. 2020/325), arts. 1, 26(12) (with arts. 7, 27(8))
  77. C18
    Act excluded in part (1.5.2020) by The Riverside Energy Park Order 2020 (S.I. 2020/419), arts. 1, 6(6) (with art. 7)
  78. C19
    Act excluded in part (21.5.2020) by The Lake Lothing (Lowestoft) Third Crossing Order 2020 (S.I. 2020/474), arts. 1, 3(e) (with arts. 51, 57)
  79. C20
    Act excluded in part (25.5.2020) by The West Midlands Rail Freight Interchange Order 2020 (S.I. 2020/511), arts. 1, 44(2) (with art. 44(8))
  80. C21
    Act excluded in part (11.6.2020) by The M42 Junction 6 Development Consent Order 2020 (S.I. 2020/528), arts. 1, 49(1) (with art. 37)
  81. C22
    Act excluded in part (18.6.2020) by The A63 (Castle Street Improvement, Hull) Development Consent Order 2020 (S.I. 2020/556), arts. 1, 29(12) (with arts. 5, 44)
  82. C23
    Act excluded in part (18.6.2020) by The A63 (Castle Street Improvement, Hull) Development Consent Order 2020 (S.I. 2020/556), art. 30(12) (with arts. 5, 44)
  83. C24
    Act excluded in part (19.6.2020) by The Cleve Hill Solar Park Order 2020 (S.I. 2020/547), arts. 1, 6 (with art. 37)
  84. C25
    Act excluded in part (22.7.2020) by The Norfolk Vanguard Offshore Wind Farm Order 2020 (S.I. 2020/706), arts. 1, 7(2) (with arts. 41, 42, Sch. 16 para. 66)
  85. C26
    Act excluded in part (6.8.2020) by The A19 Downhill Lane Junction Development Consent Order 2020 (S.I. 2020/746), arts. 1, 36(2) (with art. 5)
  86. C27
    Act excluded in part (1.9.2020) by The Immingham Open Cycle Gas Turbine Order 2020 (S.I. 2020/847), arts. 1, 27(14) (with Sch. 9 para. 144)
  87. C28
    Act excluded in part (1.9.2020) by The Immingham Open Cycle Gas Turbine Order 2020 (S.I. 2020/847), arts. 1, 28(13) (with Sch. 9 para. 144)
  88. C29
    Act excluded in part (15.10.2020) by The Great Yarmouth Third River Crossing Development Consent Order 2020 (S.I. 2020/1075), arts. 1, 3(1)(f)
  89. C30
    Act excluded in part (29.10.2020) by The Southampton to London Pipeline Development Consent Order 2020 (S.I. 2020/1099), arts. 1, 36(2) (with art. 32, Sch. 9 para. 36)
  90. C31
    Act excluded in part (31.12.2020) by The Network Rail (Cambridgeshire Level Crossing Reduction) Order 2020 (S.I. 2020/1485), arts. 1, 4(1)(d)
  91. C32
    Act excluded in part (19.1.2021) by The Network Rail (Suffolk Level Crossing Reduction) Order 2020 (S.I. 2020/1663), arts. 1, 4(d)
  92. C33
    Act excluded in part (22.1.2021) by The Hornsea Three Offshore Wind Farm Order 2020 (S.I. 2020/1656), arts. 1, 6(2) (with arts. 40, 41, Sch. 9 Pt. 5 para. 18)
  93. C34
    Act excluded in part (9.2.2021) by The A1 Birtley to Coal House Development Consent Order 2021 (S.I. 2021/74), arts. 1, 2(7) (with art. 5, Sch. 27 para. 36)
  94. C35
    Act excluded in part (19.2.2021) by The A303 Sparkford to Ilchester Dualling Development Consent Order 2021 (S.I. 2021/125), arts. 1, 3(2) (with arts. 4, 47)
  95. C36
    Act excluded in part (1.9.2021) by The Network Rail (Teddington Station Access for All) Order 2021 (S.I. 2021/937), arts. 1, 3(2)
  96. C37
    Act excluded in part (1.1.2022) by The Norfolk Boreas Offshore Wind Farm Order 2021 (S.I. 2021/1414), arts. 1, 7(2) (with arts. 41, 42, Sch. 17 para. 66)
  97. C38
    Act excluded in part (10.3.2022) by The Thurrock Flexible Generation Plant Development Consent Order 2022 (S.I. 2022/157), arts. 1, 10(f) (with Sch. 8 Pt. 6 para. 19)
  98. C39
    Act excluded in part (5.3.2022) by The Norfolk Vanguard Offshore Wind Farm Order 2022 (S.I. 2022/138), arts. 1, 7(2) (with arts. 41, 42, Sch. 16)
  99. C40
    Pt. 2 Ch. 1 excluded (W.) (22.12.2021) by The Morlais Demonstration Zone Order 2021 (S.I. 2021/1478), arts. 1, 51 (with arts. 15, 50, Sch. 11)
  100. C41
    Act excluded in part (25.3.2022) by The Bridgwater Tidal Barrier Order 2022 (S.I. 2022/299), arts. 1, 64(1) (with art. 55)
  101. C42
    Act excluded in part (22.4.2022) by The East Anglia TWO Offshore Wind Farm Order 2022 (S.I. 2022/433), arts. 1(2), 6(2) (with arts. 40, 41)
  102. C43
    Act excluded in part (12.5.2022) by The M54 to M6 Link Road Development Consent Order 2022 (S.I. 2022/475), arts. 1, 2(7)
  103. C44
    Act excluded in part (2.6.2022) by The M25 Junction 10/A3 Wisley Interchange Development Consent Order 2022 (S.I. 2022/549), arts. 1, 3(3) (with arts. 6, 34)
  104. C45
    Act excluded in part (6.6.2022) by The M25 Junction 28 Development Consent Order 2022 (S.I. 2022/573), arts. 1, 47(3) (with arts. 5, 36)
  105. C46
    Act excluded in part (30.6.2022) by The Network Rail (Essex and Others Level Crossing Reduction) Order 2022 (S.I. 2022/651), arts. 1, 4(1)(d)
  106. C47
    Act excluded in part (13.7.2022) by The A47 Blofield to North Burlingham Development Consent Order 2022 (S.I. 2022/738), arts. 1, 3 (with arts. 4, 50)
  107. C48
    Act excluded in part (1.8.2022) by The Northumberland Line Order 2022 (S.I. 2022/820), arts. 1, 19(12) (with Sch. 10 paras. 21, 43)
  108. C49
    Act excluded in part (1.8.2022) by The Northumberland Line Order 2022 (S.I. 2022/820), arts. 1, 20(7) (with Sch. 10 paras. 21, 43)
  109. C50
    Act excluded in part (2.8.2022) by The Network Rail (Oxford Station Phase 2 Improvements (Land Only)) (No. 2) Order 2022 (S.I. 2022/872), arts. 1(1), 23
  110. C51
    Act excluded in part (2.8.2022) by The Network Rail (Oxford Station Phase 2 Improvements (Land Only)) Order 2022 (S.I. 2022/871), arts. 1, 23
  111. C52
    Act excluded in part (8.9.2022) by The A428 Black Cat to Caxton Gibbet Development Consent Order 2022 (S.I. 2022/934), arts. 1, 3(1)
  112. F4
    S. 20(10) inserted (30.9.2022) by Environment Act 2021 (c. 30), s. 147(3), Sch. 20 para. 9 (with s. 144); S.I. 2022/48, reg. 5(d)
  113. F5
    S. 23(5A) inserted (30.9.2022) by Environment Act 2021 (c. 30), s. 147(3), Sch. 20 para. 10 (with s. 144); S.I. 2022/48, reg. 5(d)
  114. F6
    S. 27(4A) inserted (30.9.2022) by Environment Act 2021 (c. 30), s. 147(3), Sch. 20 para. 11(3) (with s. 144); S.I. 2022/48, reg. 5(d)
  115. F7
    Word in s. 27(3)(a) omitted (30.9.2022) by virtue of Environment Act 2021 (c. 30), s. 147(3), Sch. 20 para. 11(2)(a) (with s. 144); S.I. 2022/48, reg. 5(d)
  116. F8
    S. 27(3)(c) and word inserted (30.9.2022) by Environment Act 2021 (c. 30), s. 147(3), Sch. 20 para. 11(2)(b) (with s. 144); S.I. 2022/48, reg. 5(d)
  117. F9
    Word in s. 27(6)(a) omitted (30.9.2022) by virtue of Environment Act 2021 (c. 30), s. 147(3), Sch. 20 para. 11(4)(a) (with s. 144); S.I. 2022/48, reg. 5(d)
  118. F10
    S. 27(6)(c) and word inserted (30.9.2022) by Environment Act 2021 (c. 30), s. 147(3), Sch. 20 para. 11(4)(b) (with s. 144); S.I. 2022/48, reg. 5(d)
  119. F11
    Words in s. 30 inserted (30.9.2022) by Environment Act 2021 (c. 30), s. 147(3), Sch. 20 para. 12 (with s. 144); S.I. 2022/48, reg. 5(d)
  120. C53
    Act excluded in part (4.11.2022) by The A47/A11 Thickthorn Junction Development Consent Order 2022 (S.I. 2022/1070), arts. 1, 3(1) (with arts. 4, 52, Sch. 9 para. 82)
  121. C54
    Act restricted (4.11.2022) by The A47/A11 Thickthorn Junction Development Consent Order 2022 (S.I. 2022/1070), art. 1, Sch. 9 para. 67(1) (with arts. 4, 52, Sch. 9 para. 82)
  122. C55
    Pt. 2 Ch. 1 excluded (5.12.2022) by The Portishead Branch Line (MetroWest Phase 1) Order 2022 (S.I. 2022/1194), arts. 1, 4(1) (with art. 51)
  123. C56
    Act excluded in part (7.12.2022) by The A57 Link Roads Development Consent Order 2022 (S.I. 2022/1206), arts. 1, 31(12) (with arts. 5, 31(8))
  124. C57
    Act excluded in part (7.12.2022) by The A57 Link Roads Development Consent Order 2022 (S.I. 2022/1206), arts. 1, 32(11) (with arts. 5, 32(8))
  125. C58
    Act excluded in part (7.12.2022) by The A417 Missing Link Development Consent Order 2022 (S.I. 2022/1248), arts. 1, 3 (with art. 4)
  126. C59
    Act excluded in part (29.12.2022) by The Keadby 3 (Carbon Capture Equipped Gas Fired Generating Station) Order 2022 (S.I. 2022/1396), arts. 1, 8(1) (with art. 32, Sch. 10 paras. 26(2), 68)
  127. C60
    Act excluded (in part) (10.3.2023) by The A47 Wansford to Sutton Development Consent Order 2023 (S.I. 2023/218), arts. 1, 3(1) (with arts. 4, 50)
  128. C61
    Act restricted (18.7.2023) by The Longfield Solar Farm Order 2023 (S.I. 2023/734), art. 1, Sch. 15 para. 71(1) (with art. 19)
  129. C62
    Act excluded in part (27.7.2023) by The Boston Alternative Energy Facility Order 2023 (S.I. 2023/778), arts. 1, 40(2) (with arts. 5, 53, Sch. 8 paras. 6, 64)
  130. C63
    Act excluded in part (3.8.2023) by The Hornsea Four Offshore Wind Farm Order 2023 (S.I. 2023/800), arts. 1, 6(1) (with arts. 6(2), 42, 43, Sch. 9 Pt. 1 para. 4, Sch. 9 Pt. 3 para. 6(1), Sch. 9 Pt. 4 para. 20, Sch. 9 Pt. 9 para. 4)
  131. C64
    Act restricted (3.8.2023) by The Hornsea Four Offshore Wind Farm Order 2023 (S.I. 2023/800), art. 1, Sch. 9 Pt. 4 para. 4(1) (with arts. 42, 43, Sch. 9 Pt. 1 para. 4, Sch. 9 Pt. 3 para. 6(1), Sch. 9 Pt. 4 para. 20, Sch. 9 Pt. 9 para. 4) (as amended (31.1.2024) by The Hornsea Four Offshore Wind Farm (Correction) Order 2024 (S.I. 2024/117), art. 1(2), Sch.)
  132. C65
    Act excluded in part (4.8.2023) by The A303 (Amesbury to Berwick Down) Development Consent Order 2023 (S.I. 2023/834), arts. 1, 3(1) (with arts. 6(2), 18, Sch. 11 paras. 5, 30)
  133. C66
    Act excluded in part (7.9.2023) by The A38 Derby Junctions Development Consent Order 2023 (S.I. 2023/923), arts. 1, 3 (with arts. 4, 45, Sch. 9 paras. 6, 46, 54(1))
  134. C67
    Act excluded in part (11.10.2023) by The Awel y Môr Offshore Wind Farm Order 2023 (S.I. 2023/1033), arts. 1, 7
  135. C68
    S. 15: power to amend conferred (26.12.2023) by Levelling-up and Regeneration Act 2023 (c. 55), ss. 132, 255(3)(a) (with s. 247)
  136. C69
    Act excluded in part (7.2.2024) by The Drax Power Station Bioenergy with Carbon Capture and Storage Extension Order 2024 (S.I. 2024/70), arts. 1, 8(1) (with art. 43, Sch. 12 paras. 5, 24)
  137. C70
    Act excluded in part (9.2.2024) by The A12 Chelmsford to A120 Widening Development Consent Order 2024 (S.I. 2024/60), arts. 1, 3(1) (with arts. 4, 52, Sch. 11 paras. 6, 24, 39(1), 55(1), 84)
  138. C71
    Act restricted (9.2.2024) by The A12 Chelmsford to A120 Widening Development Consent Order 2024 (S.I. 2024/60), art. 1, Sch. 11 para. 69(1) (with arts. 4, 52, Sch. 11 paras. 6, 24, 39(1), 55(1), 71(3), 84)
  139. C72
    Act excluded in part (11.3.2024) by The Net Zero Teesside Order 2024 (S.I. 2024/174), arts. 1, 31(14), 32(13) (with arts. 31(8)(13), 32(9), 42, 43, Sch. 12)
  140. C73
    Act excluded in part (13.3.2024) by The Medworth Energy from Waste Combined Heat and Power Facility Order 2024 (S.I. 2024/230), arts. 1, 6 (with Sch. 11 paras. 5, 22, 37, 47, 82, 110)
  141. C74
    Act restricted (13.3.2024) by The Medworth Energy from Waste Combined Heat and Power Facility Order 2024 (S.I. 2024/230), art. 1, Sch. 9 para. 95(1) (with Sch. 11 paras. 5, 22, 37, 47, 82, 110)
  142. C75
    Act excluded in part (28.3.2024) by The A66 Northern Trans-Pennine Development Consent Order 2024 (S.I. 2024/360), arts. 1, 3(1) (with arts. 18, 35, Sch. 9)
  143. C76
    Act restricted (28.3.2024) by The A66 Northern Trans-Pennine Development Consent Order 2024 (S.I. 2024/360), art. 1, Sch. 9 para. 66(1) (with arts. 18, 35, Sch. 9)
  144. C77
    Act excluded in part (5.4.2024) by The National Grid (Yorkshire Green Energy Enablement Project) Development Consent Order 2024 (S.I. 2024/393), arts. 1, 36(13) (with arts. 36(9)(12), 44, Sch. 15)
  145. C78
    Act excluded in part (11.4.2024) by The HyNet Carbon Dioxide Pipeline Order 2024 (S.I. 2024/436), arts. 1(2), 8(1) (with arts. 21, 41, Sch. 10)
  146. C79
    Act excluded in part (9.5.2024) by The Sheringham Shoal and Dudgeon Extensions Offshore Wind Farm Order 2024 (S.I. 2024/564), arts. 1, 6(1) (with arts. 35, 36, Sch. 14)
  147. C80
    Act restricted (9.5.2024) by The Sheringham Shoal and Dudgeon Extensions Offshore Wind Farm Order 2024 (S.I. 2024/564), art. 1, Sch. 14 Pt. 3 para. 4(1) (with arts. 35, 36, Sch. 14)
  148. C81
    Act excluded in part (14.6.2024) by The A1 in Northumberland: Morpeth to Ellingham Development Consent Order 2024 (S.I. 2024/733), arts. 1, 3 (with art. 6, Sch. 10)
  149. C82
    Act excluded in part (3.8.2024) by The Mallard Pass Solar Farm Order 2024 (S.I. 2024/796), arts. 1, 6(1)(g) (with Sch. 15)
  150. C83
    Act restricted (3.8.2024) by The Mallard Pass Solar Farm Order 2024 (S.I. 2024/796), art. 1, Sch. 15 para. 76(1) (with Sch. 15)
  151. C84
    Act excluded in part (3.8.2024) by The Sunnica Energy Farm Order 2024 (S.I. 2024/802), arts. 1, 6(1)(g) (with art. 44, Sch. 12)
  152. C85
    Act restricted (3.8.2024) by The Sunnica Energy Farm Order 2024 (S.I. 2024/802), art. 1, Sch. 12 para. 109(1)(q) (with art. 44, Sch. 12)
  153. C86
    Act excluded in part (3.8.2024) by The Gate Burton Energy Park Order 2024 (S.I. 2024/807), arts. 1, 6(1) (with art. 45, Sch. 14)
  154. C87
    Act restricted (3.8.2024) by The Gate Burton Energy Park Order 2024 (S.I. 2024/807), art. 1, Sch. 14 para. 116(1) (with art. 45, Sch. 14)
  155. C88
    Act excluded in part (27.9.2024) by The Cottam Solar Project Order 2024 (S.I. 2024/943), arts. 1, 6(1) (with art. 48, Sch. 15)
  156. C89
    Act excluded in part (4.10.2024) by The National Grid (Bramford to Twinstead Reinforcement) Order 2024 (S.I. 2024/958), art. 1, Sch. 15 para. 3 (with art. 40, Sch. 14)
  157. C90
    Act excluded in part (9.10.2024) by The M3 Junction 9 Development Consent Order 2024 (S.I. 2024/752), arts. 1, 3(1) (with art. 4, Sch. 10) (as amended by S.I. 2024/1020, Sch.)
    Act restricted (25.10.2024) by The Associated British Ports (Immingham Eastern Ro-Ro Terminal) Development Consent Order 2024 (S.I. 2024/1014), art. 1, Sch. 4 para. 71(1)(h) (with arts. 36, 40, Sch. 4)
  158. C91
    Act excluded in part (18.12.2024) by The Network Rail (Leeds to Micklefield Enhancements) Order 2024 (S.I. 2024/1284), arts. 1, 28(13), 29(12), 30(7) (with arts. 28(7), 29(8), Sch. 15)
  159. C92
    Act excluded in part (15.2.2025) by The West Burton Solar Project Order 2025 (S.I. 2025/116), arts. 1, 6 (with art. 47, Sch. 15)
  160. C93
    Act excluded in part (17.2.2025) by The Heckington Fen Solar Park Order 2025 (S.I. 2025/85), arts. 1, 6(1) (with art. 43, Sch. 13)
  161. C94
    Act restricted (17.2.2025) by The Heckington Fen Solar Park Order 2025 (S.I. 2025/85), art. 1, Sch. 13 para. 85(1)(r) (with art. 43)
  162. C95
    Act excluded in part (27.2.2025) by The Associated British Ports (Immingham Green Energy Terminal) Order 2025 (S.I. 2025/165), arts. 1, 3(1) (with arts. 48, 59, Sch. 14)
  163. C96
    Act excluded in part (4.4.2025) by The North Lincolnshire Green Energy Park Order 2025 (S.I. 2025/362), arts. 1, 11(2) (with Sch. 14)
  164. C97
    Act restricted (4.4.2025) by The North Lincolnshire Green Energy Park Order 2025 (S.I. 2025/362), art. 1, Sch. 14 para. 49(1)(t) (with Sch. 14)
  165. C98
    Act excluded (24.4.2025) by The London Luton Airport Expansion Development Consent Order 2025 (S.I. 2025/463), arts. 1, 43 (with Sch. 8 paras. 36(3), 87)
  166. C99
    Act excluded in part (28.4.2025) by The Rampion 2 Offshore Wind Farm Order 2025 (S.I. 2025/468), arts. 1, 6(2) (with arts. 47, 48, Sch. 10)
  167. C100
    Act restricted (28.4.2025) by The Rampion 2 Offshore Wind Farm Order 2025 (S.I. 2025/468), art. 1, Sch. 10 Pt. 6 para. 4(t) (with arts. 47, 48, Sch. 10)
  168. C101
    Act excluded in part (1.5.2025) by The Viking CCS Carbon Dioxide Pipeline Order 2025 (S.I. 2025/509), arts. 1(2), 36(1) (with art. 41, Sch. 9)
  169. C102
    Act excluded in part (31.5.2025) by The East Yorkshire Solar Farm Order 2025 (S.I. 2025/585), arts. 1, 6(1) (with art. 49, Sch. 14)
  170. C103
    Act restricted (31.5.2025) by The East Yorkshire Solar Farm Order 2025 (S.I. 2025/585), art. 1, Sch. 14 para. 59(1) (with art. 49, Sch. 14)
  171. C104
    Act excluded in part (25.6.2025) by The M5 Junction 10 Development Consent Order 2025 (S.I. 2025/795), arts. 1, 3(c) (with arts. 4, 43, Sch. 9)
  172. C105
    Act excluded in part (11.7.2025) by The Oaklands Farm Solar Park Order 2025 (S.I. 2025/739), arts. 1, 6(1)(d) (with Sch. 10)
  173. C106
    Act excluded in part (28.7.2025) by The Mona Offshore Wind Farm Order 2025 (S.I. 2025/870), arts. 1, 8(d) (with arts. 37, 38, Sch. 10)
  174. C107
    Act restricted (28.7.2025) by The Mona Offshore Wind Farm Order 2025 (S.I. 2025/870), art. 1, Sch. 10 para. 103(1) (with arts. 37, 38, Sch. 10)
  175. C108
    Act excluded in part (14.8.2025) by The Byers Gill Solar Order 2025 (S.I. 2025/934), arts. 1, 7(b) (with art. 43, Sch. 11)
  176. C109
    Act excluded in part (30.9.2025) by The M60/M62/M66 Simister Island Interchange Development Consent Order 2025 (S.I. 2025/1018), arts. 1, 45 (with arts. 5, 34, Sch. 9)
  177. C110
    Act excluded in part (12.10.2025) by The Gatwick Airport (Northern Runway Project) Development Consent Order 2025 (S.I. 2025/1054), arts. 1, 45(2) (with arts. 5, 9(6), 43, Sch. 9)
  178. C111
    Act restricted (12.10.2025) by The Gatwick Airport (Northern Runway Project) Development Consent Order 2025 (S.I. 2025/1054), art. 1, Sch. 9 para. 43(1) (with arts. 5, 9(6), 43, Sch. 9)
  179. C112
    Act excluded in part (22.10.2025) by The A46 Newark Bypass Development Consent Order 2025 (S.I. 2025/1090), arts. 1, 3(1) (with arts. 4, 9, 51, Sch. 9)
  180. C113
    Act restricted (22.10.2025) by The A46 Newark Bypass Development Consent Order 2025 (S.I. 2025/1090), art. 1, Sch. 9 para. 34(1) (with arts. 4, 9, 51, Sch. 9)
  181. C114
    Act excluded in part (5.11.2025) by The Tillbridge Solar Order 2025 (S.I. 2025/1105), arts. 1, 6(1)(g) (with art. 49, Sch. 15)
  182. C115
    Act restricted (5.11.2025) by The Tillbridge Solar Order 2025 (S.I. 2025/1105), art. 1, Sch. 15 para. 143(1) (with art. 49, Sch. 15)
  183. C116
    Act excluded in part (13.11.2025) by The Stonestreet Green Solar Order 2025 (S.I. 2025/1175), arts. 1, 8(1) (with art. 40, Sch. 13)
  184. C117
    Act restricted (13.11.2025) by The Stonestreet Green Solar Order 2025 (S.I. 2025/1175), art. 1, Sch. 13 para. 77(1) (with art. 40, Sch. 13)
  185. C118
    Act excluded in part (27.11.2025) by The Cory Decarbonisation Project Order 2025 (S.I. 2025/1227), arts. 1, 7(1) (with Sch. 12)
  186. C119
    Act excluded in part (29.12.2025) by The Helios Renewable Energy Project Order 2025 (S.I. 2025/1372), arts. 1, 8(1) (with Sch. 9)
  187. C120
    Act restricted (29.12.2025) by The Helios Renewable Energy Project Order 2025 (S.I. 2025/1372), art. 1, Sch. 9 para. 92(1) (with Sch. 9)
  188. C121
    Act excluded in part (8.1.2026) by The Five Estuaries Offshore Wind Farm Order 2025 (S.I. 2025/1376), arts. 1, 8(e) (with arts. 39, 40, Sch. 9)
  189. C122
    Act excluded in part (25.2.2026) by The A46 Coventry Junctions (Walsgrave) Development Consent Order 2026 (S.I. 2026/125), arts. 1, 52(2) (with arts. 40, 45, Sch. 9)
  190. C123
    Act excluded in part (4.3.2026) by The Outer Dowsing Offshore Wind Farm Order 2026 (S.I. 2026/138), arts. 1(2), 6(2) (with arts. 6(6), 42, 43, Sch. 18)
  191. C124
    Act restricted (4.3.2026) by The Outer Dowsing Offshore Wind Farm Order 2026 (S.I. 2026/138), art. 1(2), Sch. 18 para. 114(1) (with arts. 42, 43, Sch. 18)
  192. C125
    Act excluded in part (11.3.2026) by The Fenwick Solar Farm Order 2026 (S.I. 2026/151), arts. 1, 6(1)(h) (with Sch. 14)
  193. C126
    Act restricted (11.3.2026) by The Fenwick Solar Farm Order 2026 (S.I. 2026/151), art. 1, Sch. 14 para. 32(1)(r) (with Sch. 14)